Thursday, 9 September 2010

Foundation Task Update 7

Before the school term ended for the summer, me and Shane had been busy with our foundation production. The editing was completed before the end of term to the point where we were both pleased with how the production turned out.

Although we did encounter problems during the editing process, the first being the music. The soundtrack was in sync with the footage before we started editing, however when editing the footage down, we soon realized that we would have to re align the music with the footage so that they were both in sync with each other. This problem was soon resolved.

The second issue was with LiveType. We decided on our opening titles through various experimenting with different fonts and effects. However once we imported the titles and credits, we realized for the second time that the music was out of sync. So like before we had to re align the music to match the footage and now the titles. We did this by resorting to adding a separate track for the opening titles so that it would blend in to the other music track without 'jumping'.

The third problem was with the titles appearing over the film itself. We had decided on where the titles would appear and at points we were removing certain title segments, re-phrasing them and changing their position on screen. However after many changes, Shane and myself were pleased with how the titles had turned out.

Foundation Task Update 6

Whilst working with Livetype, myself and Shane have been using Garageband to compose a piece of music for our horror opening. Beforehand we had used Garageband to record two voice overs that we wanted to use in the opening.

We did run into a slight problem when it came to importing the voice overs into Final Cut Express 4. However we resorted into placing the music files onto a CD and then imported them into Final Cut.

Saturday, 19 June 2010

Foundation Task Update 5

Now that the editing process is underway, which is near completion, me and Shane began to work on the titles for our opening, for this we used software called 'LiveType'.

Trial and error is how we are deciding on for example which fonts to use etc. At this moment in time, we have two title clips which we are both pleased with however we are both still undecided on which one to use. These two clips will be added to this post at a later date.

Foundation Task Upate 4

Our filming has now been completed for our horror opening. Although we we were successful in obtaining our footage, there were some issues which did occur along the way.

The location which we originally had to be changed due to accessibility and also the space in which we had to work with. This led to the location being changed to my front yard as there was a secluded area which met the criteria of what we needed for our location.

Now because that we had changed location, this meant we had to adapt our camera shots/angles to suit the new,smaller,area. Also, the road scenes were very time consuming as we had no control over the passing cars. So we did have to comprimise with some of the shots which we wanted to use.

Also in the road scenes, we failed to notice, until reviewing the footage, that there was a fingerprint-like smudge on the camera lens,despite this however, we did manage to obtain crucial footage which we can use for our opening.

Wednesday, 21 April 2010

Foundation Task Update 3

Now that we have finished everything in pre-production, all that is left to do is the filming itself.

Thursday, 1 April 2010

Foundation Task Update 2

We have recently been using LiveType to experiment with the different effects. We have also thought over what titles will be included which are as follows:

- Intro titles, company names, e.g. production
- Starring... Scott Manson
- Co directed by... Shane Bingham & Ryan Gatland
- Written by... Shane Bingham
- Music composed by... Ryan Gatland

Monday, 22 March 2010

Foundation Task Update

We have recorded the needed voice overs for our film using Apple's software GarageBand, we are now practising with the software for when we edit our film.

Wednesday, 10 March 2010

Main Task Update - Checklist

Before the filming can be done, we have certain tasks which need completing:

Props: (3/3 done)
Casting: (1/1)

The three individual props are almost complete however they do need some finishing touches and the casting is being worked on during school hours.

Update 1 - We now have two of the three props, all that remains is to get a hard back book and use our cover with it.

Update 2 - The book cover has been completed all that is needed is to assemble it and for the casting to be decided.

Update 3 - Casting has now been finished.

Wednesday, 3 February 2010

Preliminary Task - Update 2

Now that we have learned about how to edit, we are now able to use Final Cut Express and edit together our pieces of preliminary footage. However the use of the new footage is still awaiting an answer.

Once we have gained an answer to which footage we can use, the editing stage will commence immediately.

Preliminary Task - Update 1

The filming for our preliminary task has been completed and has been successfully imported onto an iMac. However we are still unsure about using the new footage we have obtained. Although both pieces of footage are compatible with Final Cut Express.

Tuesday, 5 January 2010

Casting

Pen Portraits

Name - Alex Haden
Age - 17
Personality - Socially withdrawn, rarely speaks, intelligent, shy but friendly

Name - Alex Haden (Hyde)
Age - ???
Personality - Insane, devious, cunning, intellegent and evil

How we are going to cast:
Firstly we'll think about the people we know e.g friends or relatives. If neccessary, we will hold auditions in school.

Location Planning

Location 1 - Road/Bridge - Geddington


 -Advantages-
Ideal Enviroment
Easy Access

-Disadvantages-
Traffic (Vehicles/Pedestrians)
Possible camera difficulty with nearby houses

Location 1.5 - Road/Bridge - Warkton


-Advantages-
Secondary Bridge
No background obstructions e.g houses

-Disadvantages-
Traffic
Not entirely easy access

Location 2 - Forest Clearing - Brambleside Woods


 -Advantages-
Lots of space
relatively easy access

-Disadvantages-
Noise from nearby road
possible dog walkers

Location 2.5 - Forest Clearing - Weekly Glebe Field


-Advantages-
Near to School
Easy Access

-Disadvantages-
Lack of space